2022 June, VKG Energia, Estonia.
Supply of oil separators for the 4th insulated bearing of the T-32-2V3 turbogenerator.
2022 April - May, VKG Energia, Estonia
Performance of emergency shutdown works on turbine generator No. 52022 February, VKG Energia, Estonia
Works on opening and closing the cover of bearing No. 1 of turbogenerator No. 5 and installation of temperature gauge2021 July - October , Jekabpils Siltums, Latvia
Delivery and replacement of bearings of turbine generator SG-2-600-4U3
2021, UAB Kvant, Lithuania
Mechanical works during the maintenance of Ignalina NPP steam boiler processing equipment
2020, Schwenk SIA, Latvia
Repair-installation services on cement production plant in Latvia
2014 January – February, SIA “CEMEX”, Latvia.
Fans overhaul, conveyor repair. Slide bearing repair and replacement.
2013 March - December, BARD Offshore, Germany.
Electromechanical works and services for the wind power turbines.
2013 August, SIA “Amelina”.
Equipment installation and adjustment,metal construction erection, pipeline lying.
2013 June, SIA “Achema” Lithuania.
Repair works, equipment installation, pipeline lying.
2013 May – October, SIA “Jekabpils siltums”, Latvia.
Repair work for turbine 0,6/0,4-К1.3 and generator SG-2-600-4U3.
2013 January – March, Kivioli, Estonia.
Service maintenance of turbine 6MW.
2013 January – February, SIA “CEMEX”, Latvia.
Fans overhaul, conveyor repair. Slide bearing repair and replacement.
2012 April – October , SIA “Jekabpils siltums”, Latvia.
Repair work for turbine 0,6/0,4-К1.3 and generator SG-2-600-4U3.
2012 May – August , JSC “Vilniaus energija”, Lithuania.
Repair & maintenance works for generator ТGV-200-2МU3.
2012 April – December, SIA “Energoremonts Rīga”, Latvia.
Installation of steel structures and pipelines equipment. Participation in thermal power plant construction.
2012 April – December, SIA “Energoremonts Rīga”, Latvia.
Service maintenance of turbine, generator and TEC-2 equipment.
2012 April – May, “ORLEN Lietuva”, Lithuania.
Dismantle, installation and repair facilities. Pipeline laying.
2012 January – February, SIA “CEMEX”, Latvia.
Fans overhaul, conveyor repair. Slide bearing repair and replacement.
2011 October – November, TPP Kardia, Greece
Turbogenerator ТВВ-320-3У complete overhaul.
2011 September, SOE “Ignalina Nuclear Power Plant”, Lithuania.
Transformer ТНЦ 1000000/330 maintenance overhaul.
2011 August – October, JSC “Ignalina heat networks”, Lithuania.
Economizer retrofit, steel constructions erection, pipeline laying, equipment installation and commissioning.
2011 May – July, JSC “Vilniaus energija”, Lithuania.
Steam turbine Т -180//210-130 repair.
2011 April – May, “ORLEN Lietuva”, Lithuania.
Dismantle, installation and repair facilities. Pipeline laying.
Turbine repairs:
- К-750-3000-65 – SOE “Ignalina Nuclear Power Plant”, Lithuania.
- К-160-130-2 – JSC "Lietuvos elektrine", Lithuania.
- T-180/210-130 - JSC "Vilniaus energija", Lithuania.
- ТГ-0,6/0,4-К1.3 – JSC "Jekabpils siltums", Latvia.
Generators repairs:
- ТВВ-800-2У3 – SOE “Ignalina Nuclear Power Plant”.
- ТВВ-160-2УЗ - JSC "Lietuvos elektrine", Lithuania.
- TВВ-200-2УЗ - JSC "Vilniaus energija".
- TBB-300-2У3 - Nr. 3, Thermal Power Station „Kardija“, Greece.
- CГ-2-600-4У3 – JSC "Jekabpils siltums", Latvia.
Turbine assembling & installation:
- В6-3.43/0.35 Kiviˇõli Keemiatööstuse OÜ, Estonia.
Generator installation:
- QFW-6-2 Kiviˇõli Keemiatööstuse OÜ, Estonia.